| This seems like the kind of article that would trigger some reactions for people working in the field, in the thick of the architecture/building interface. If you're one of "them", from either side, what do you think? |
|
| Back to top |
|
 |
cowtowner
Joined: 12 Dec 2006 Posts: 2
|
Posted: Tue Dec 12, 2006 9:33 pm Post subject: |
    |
|
| First, lets start seeing a full set of blueprints before we try to build the thing, then worry about coordination. Or an RFI returned in less than 2 weeks while everybody twiddles thier thumbs because something else was overlooked in the design of the building. |
|